- 1.TANK
200L Buffer tank with thermal insulation
Safety valve 3 bars
Automatic bleed valve in the upper part
Pressure manometer 0/4 bars
Lateral thermometer 0/120°C for visualization of the stratification
- 2.RODUCTION CIRCUIT
Quick connector for the connection to two production systems
Thermometers 0/120°C at the input and output of each circuit for the production
- 3.DISSIPATION CIRCUIT
- Quick connector for the connection to two dissipation systems
- Thermometers 0/120°C at the input and output of each circuit for the dissipation
- Flow rate measurement in each production circuit
- Differential pressure valve for the protection of the water pumps
- Water pumps with variable speed with manometer in parallel for measuring the TDH
- 4.ELECTRIC BOX
Power box with differential circuit breaker and starting switch of the water pumps